Home > Products >  3/8 in. x 50 ft. api choke kill hose for petroleum
Email:[email protected]

Leave a Reply

3/8 in. x 50 ft. api choke kill hose for petroleum

API 5DP, API 7G, & ISO 9001 First class slick drill collars, …

Item Name Spiral or Slick O.D I.D Tool joint Bevel diameter in Material Overall length in in Connection ft 1 Drill collar Slick or Spiral 3.1/8 1.1/4 NC26 2.3/8"IF 3 4145H 30 or 31 2 Drill collar Slick or Spiral 3.1/2 1.1/2 NC26 2.3/8"IF 4145H 30 or 31 3 Drill collar Slick or

Technical Specifiion of AGC301 Truck-mounted Drilling Rig …

1 I. General Introduction 1. General Instruction for 750HP Truck-mounted Drilling Rig ¾ The 750HP truck-mounted drilling rig is designed and manufactured according to the latest API standard and main parts will be marked with API official monogram. ¾ Model of

Goldenman Petroleum Equipment Co., Limited|mud …

Goldenman Petroleum Equipment Co., Limited is in the beautiful oil city, Dongying, by Yellow River delta. We are a first class authorized company of sinopec, and meer of ccoic and ccpit . After years of development, GPEC devoted itself to be a total solution

HONDA GXH50 OWNER''S MANUAL Pdf Download | …

Disconnect the spark plug cap, and remove any dirt from around the spark plug area. 2. Remove the spark plug with a 5/8-inch spark plug wrench. 3. Page 36 6. After the spark plug seats, tighten with a 5/8-inch spark plug wrench to

TUTORIAL CENTRIFUGAL PUMP SYSTEMS

3. What is friction in a pump system 4. Energy and head in pump systems 5. Static head 6. Flow rate depends on elevation difference or static head 7. Flow rate depends on friction 8. How does a centrifugal pump produce pressure 9. What is total head 12.

Ball Valves | Parker NA

Parker supplies a comprehensive range of ball valves that control flow direction and support a diverse range of system requirements. Our ball valves are both reliable and economical when it comes to service and are available in various configurations and options.

Hebei Jingbo Petroleum Machinery Co of China | Get a …

Description 5INCH X 90FT, 750PSI HP MUD JUMPER HOSE, BONDED, END A- 6INCH FIG 1002, BUTTWELDED, , STANDARD API SPEC. 7K-FSL LE …

China API 6A Wellhead X-Mass Tree manufacturer, API …

China Flange Riser Spool/ Adapter Spool Flange for API 6A Wellhead, Find details about China Riser Spool, Flange Adapter from Flange Riser Spool/ Adapter Spool Flange for API 6A Wellhead - Jianhu Jielin Petrochemical Machinery Co., Ltd.

1502 offers full MPD/UBD Services and Expertise

MPD-UBD and 1502 MPDS was originally established in 2010 as an independent company offering a full range of services to the Oil & Gas Industry. When Multi Phase Drilling Solutions closed its doors in 2015, 1502 acquired some of its equipment and signed

Retail Markets | Telecom | Petroleum Refining & Marketing | …

requirement of latest API standards. Riser should be equipped with suitable Buoyancy system for operations in the above stated water depths. Choke & Kill Manifold : Sour treated/H2S trim, 15M WP C & K manifold and lines along with Control Panel as per API

Search | Schluerger

Stay connected—Remeer to update your registration information. Click here

Cleaning and Flushing Basics for Hydraulic Systems and …

7/8/2020· The fluid velocity (V) should not be less than 2 to 3 m/sec. (106 ft./sec.) in any part of the flushing loop. This prevents settling of particles inside tubes and hoses. The coldest part in the flushing loop should have a minimum temperature of 122 F (50 C). This can

Subsea BOP Stack Systems__

Riser joints are 75 ft long with a 21-in. OD and 13/16-in. wall thickness. Riser couplings are rated for 2.5 million lb and the riser is equipped with 41/2-in. ID 15,000 psi choke and kill lines, a 3.82-in. ID 6,000 psi boost line, and a 2.62-in. ID 5,000 psi hydraulic

API - Valve Standards

API Specifiion 6D is an adoption of ISO 14313: 1999, Petroleum and Natural Gas Industries-Pipeline Transportation Systems-Pipeline Valves. This International Standard specifies requirements and gives recommendations for the design, manufacturing, testing and documentation of ball, check, gate and plug valves for appliion in pipeline systems.

Google Translate

Google''s free service instantly translates words, phrases, and web pages between English and over 100 other languages. Translation history will soon only be available when you are signed in and will be centrally managed within My Activity.Past history will be

TORO TIMECUTTER Z SERIES SERVICE MANUAL Pdf …

View and Download Toro TimeCutter Z Series service manual online. TimeCutter Z Series lawn mower pdf manual download. Also for: Timecutter z17-44, Timecutter z17-52, Timecutter z18-52, Timecutter z16-44, Timecutter zx series, Timecutter zx 17k-44

KAWASAKI KFX50 SERVICE MANUAL Pdf Download | …

ENGINE INSTALLATION Reverse the “REMOVAL” procedures. TORQUE VALUES Engine bracket bolt 27 N·m (2.7 kgf·m, 20 lbf·ft) Front engine mounting bolts 45 N·m (4.5 kgf·m, 32 lbf·ft) Rear engine mounting bolts 32 N·m (3.2 kgf·m, 23 lbf Page 107: Cylinder

Christmas tree (oil well) - Wikipedia

In petroleum and natural gas extraction, a Christmas tree, or "tree", is an assely of valves, spools, and fittings used to regulate the flow of pipes in an oil well, gas well, water injection well, water disposal well, gas injection well, condensate well and other types of wells. It was named for its reselance to the series of starting

Petroleum - Wikipedia

Petroleum, in one form or another, has been used since ancient times, and is now important across society, including in economy, politics and technology. The rise in importance was due to the invention of the internal coustion engine, the rise in commercial aviation, and the importance of petroleum to industrial organic chemistry, particularly the synthesis of plastics, fertilisers, solvents

Gulfsands Petroleum plc announces award of exploration …

Cameron 18 3/4 x 10k Subsea Stack Description Cameron 18 3/4 x 10k subsea stack and LMRP Complete E.2. Primary BOP Stack (from bottom to top) : Stack complete with Guide frame : Yes Pick up attachment : Yes Transport base : No Size - bore : 18

Choke Line - an overview | ScienceDirect Topics

This method exposes formation to the full choke line friction during circulation. It is not recommended for wells where the reservoir is exposed. It can be used if the circulation path is isolated from the reservoir, e.g., the circulation path is through a sliding sleeve above a mechanical plug or closed FIV, or in an unperforated well (Fig. 14.5).

Wellhead equipment Introduction Based on API 6a & NACE

4/7/2018· API 6 A 2. Wellhead 3. Control Lines 4. Wear bushing & Running Tool 5. BPV & VR Plugs 6. Gaskets 7. Ball Valve with Adapter 8. Block Tree 9. Conventional …

API

6/8/2020· The American Petroleum Institute (API) is the only national trade association that represents all aspects of America’s oil and natural gas industry. Our more than 600 corporate meers, from the largest major oil company to the smallest of independents, come from

Casing Hanger - an overview | ScienceDirect Topics

At 3:04 p.m. the blowout preventer (see Figure 4.4), connecting the riser to the rig with the long string casing in the well, was flushed with seawater to displace the mud as well as the choke, boost, and kill lines, while the kill line remained pressurized at 1200 psi.

Shanghai Boss Petroleum Equipment C of China | Get a …

Shanghai Boss Petroleum Equipment C Records Get a complete supplier history Updated: 2020-05-28 Overview Shipments Importers About Total Shipments 0 Date range Available to paid subscriber 1M 3M 6M 1Y 3Y All 2006-11-01 Available to paid

Flow Measurement: The Truth About Upstream And …

The upstream requirement can increase if, for example, there are two elbows in different planes (up to 50 straight pipe diameters). Alternatively, the upstream straight run requirement can be reduced if some form of flow straightening is used, down to 10 straight pipe diameters upstream.